FBRLP Manufacturing
This 12 acre site included a 12,000 s.f. pre-engineered crane building with Offices and Break Rooms, in addition to over 5 acres of Laydown area constructed by Bass´ Earthwork ...



Gurecky Manufacturing
This 10,000 s.f. design/build pre-engineered metal building is an addition to an existing facility. It has a 24 ga. standing seam roof and 26 ga. R-Panel exterior walls. The expansion ...



Albis Plastics
In 1989 Bass was contacted by a German Plastics Company concerning an 80,000 s.f. facility to be built in West Rosenberg, Texas. After fighting off stiff competition, Bass was awarded ...



South Texas Nuclear Plant
Civil project involving stringent security measures brought about by Homeland Security. In fact this project was one of several around the country started in response to 9/11 and was ...



Flanders Air Seal
This customer had two specific needs to meet. The first was moving equipment and product within the building. Bass Construction designed the building with two (2) 10 ton overhead ...



WRCA - Camesa, Inc.
Bass Construction has completed numerous projects at the Camesa facility in Rosenberg, Texas. These have ranged from (6) machine pads with intricate layout and anchorage requirements ...



Elge, Inc.
The key to this laboratory renovation was coming up with the absolute right mechanical design. It required extreme air changes and air balance with highly specialized filtration ...