Education

Bass Construction has been building educational facilities for many years. Below are just a few examples.



Lamar Consolidated 15 School Package
It´s hard enough to complete one remodeling school project during summer break, but to tackle fifteen (15) seems impossible. Well, with the help of some excellent subcontractors ...



Terry High School & Field House
This project consisted of major summer renovations to the high school and field house, as well as a 3,500 sf addition to the field house. A brand new front entrance was built to help ...



Athletic Administrative Complex
Once again Bass Construction was faced with a tremendous challenge. Being awarded an 8,000 s.f. pre-engineered field house in March, 2008 with an late August completion date, the ...



Alvin I.S.D. Safety & Technology Center
Alvin I.S.D. - Safety and Technology Center
CSP Job. After Value Engineering, Bass Construction was able to reduce the cost by approximately $600,000, or 25%, keeping it in budget.



Jane Long Elementary School Addition
This project consisted of not only a new 35,824 s.f. classroom, auditorium and cafeteria addition, but the complete overhoul and renovation for an existing Special Needs Facility. The ...



LCISD George Junior High School
Complete renovation accomplished in only 75 days. Work was phased for successful completion.



LCISD Traylor Stadium
Renovations to bleachers, as well as adding two new restroom facilities constructed out of CMU block



Pearland I.S.D. - Transportation Facility
Location: Pearland, Brazoria County, Texas

2,500 Square Foot Renovation and 11,000 Square Foot Addition to Existing Transportation Facility. Including New Offices, Training ...



Needville Middle School Re-Roof
New Duro-Last Roof over existing and standing seam metal roofs at entry and bus drop-off. Project also included new metal wall panels and translucent wall panels and skylights as well ...



Angleton ISD Misc Projects Summer
Renovations at 9 different campuses including Early Childhood Center, Frontier ES, Northside ES, Southside ES, Rancho Isabella ES, Westside ES, Angleton MS, Angleton HS & Marshall ...



Alvin High School - Football Stadium/Auditorium
School & Football in Texas always starts in August and is on time. When Alvin ISD & SWH Architects were to remodel both the stadium, including two new concessions / restrooms, two ...



LCISD Meyer Elementary School
This project consisted of a new 10,560 s.f. addition and renovations to the existing facility.

The new structure consisted of computer, science, art and multi-purpose ...



LCISD Beasley Elementary School
Upgrades included a complete interior renovation, replace roof / HVAC system and bringing all facilities up to ADA code compliance in a summer time period.



LCISD Huggins Elementary School
Upgrades included a complete interior renovation, replace roof / HVAC system and bringing all facilities up to ADA code compliance in a summer time period.











Bass Construction Co., Inc. 1124 Damon St. Rosenberg, Texas 77471 - PHONE 281.342.2022 - FAX 281.341.5071